The Building Site


Mum and Dads new bedroom with the new bricks.
Our new front Garden.And finally serenity in the forest.
.

Wednesday, 22 August 2012

A picture is worth a thousand words

Checking out our new bedroom
And the builders sang happy birthday
Before it all started
Here comes sandy

Our front door
Tractor!
Packing up the children
Our new family
Our front garden

Tuesday, 21 August 2012

Making the poo network

The sewage pipe going into the septic tank 
The sewage pipe from the house and the summer
house joined together.
20th August 2012. Today the groundworks men dug the trenches and put the sewage pipes in, here are some pictures.

Friday, 17 August 2012

Higher and Higher!

17th August 2012. Today the brick layers built the walls even higher, the house really looks like a house now.  Here is a picture.

The car pitt collapsing

16th August 2012. Today when Bob and Sandy helped the concrete man to pour in the floor for the garage, the weight of the concrete was too much and car pitt walls collapsed in. Bob asked me to call dad to see it, when he got there they thought about what they could do until dad, bob and sandy made a decision that they will dig out the rubble and concrete before it sets and build a new car pitt. The video footage of the car pitt collapsing is above.

Wednesday, 15 August 2012

The walls are going up!

Georgie's and Fran's bedroom
14th August 2012. Today the walls of Georgie's and Fran's room have gone up even higher the bricklayers also started building the walls around the front window. It's really exciting to see the house walls being built.

Monday, 13 August 2012

Building the outer walls

13th August 2012. Today the bricklayers started to build the outer walls on Fran's and Georgie's bedroom. They look very smart. Also, mum has been packing up the house because we just found out we have to move out the house this saturday.

Friday, 10 August 2012

Building the inner walls

Georgie's and fran's bedroom

The master bedroom
9th August 2012. Today the brick layers did the inner walls it was amazing to see the building go up. Also the three brick pallets were taken to the house because the are going to be used soon. Here are some pictures.

Thursday, 9 August 2012

Pouring the floors in

Georgie with jim by the car pitt.
The back door
8th August 2012. Today a lot happened because now all the DPM (it is plastic for the floors to keep the damp out) is in place and the concrete was poured however the workers still haven't totally finished the floors yet. The diggers also have tackled making a car pitt so if the cars are broken dad could get under neath them and fix them. Here are some pictures.
Georgie's and fran's bedroom
The kitchen extension

Wednesday, 8 August 2012

Putting the sand in

Fran posing at the camera!

Frans and George's new bedroom
7th August 2012. Today the workers put the sewage pipes in and then put sand on them they did this so that tomorrow they would be ready to pour the flours in. Here are some pictures.

Sunday, 5 August 2012

Making rubble

4th August 2012. Today dad destroyed the front doorstep, it was super loud. He then used the rubble to  
help make the floors higher. So now our front door leads to a pile of rubble. He also started making a hole for the pipes to go through for the new toilet, there is now a massive hole in our hall way. Fran and George have been away at grandmas so when they came they got a shock especially Fran because her bedroom was gone and had to be moved to ours.
Here is a picture of the rubble.